Flint Cottage Andersons Lane Great Hormead Hertfordshire SG9 0PA
15th April 2026
Change of use of agricultural buildings to three residential dwellings
Snow End House Anstey Hertfordshire SG9 0DJ
6th March 2026
Installation of 24 solar panels, seated behind high hedges and trees, including batteries for storage that would sit in a large shed
Snow End House Anstey Hertfordshire SG9 0DJ
21st February 2026
Listed Building Consent for installation of 24 solar panels, seated behind high hedges and trees, including batteries for storage that would sit in a large shed
Flint Cottage Andersons Lane Great Hormead Hertfordshire SG9 0PA
18th November 2025
Removal of Condition 3 (Agricultural use) pursuant to planning permission (ref: 3/05/0045/FP /Dated 08/03/2005) for (Stables and sheep pen)
Agricultural Barn Adjacent To Flint Cottage Andersons Lane Great Hormead Hertfordshire SG9 0PA
15th September 2025
Prior approval application (Part 3, Class Q) for change of use and conversion of existing agricultural barn to create 3 x 3-bed dwellings and associated operational development
High Hall Farm Mill Lane Anstey Hertfordshire SG9 0BL
27th August 2025
Conversion of outbuilding to create an ancillary bedroom, home office and a gym/play room. Insertion of rooflights. Alterations to the fenestration.
10 Lincoln Hill Anstey Hertfordshire SG9 0DL
18th July 2025
Demolishing of outbuildings within proposed extension footprint, single story rear extension with flat roof incorporating a roof light or lantern. Roof height of 3.1m (3.8m including roof lantern).
Bentleys Cottage Mill Lane Anstey Hertfordshire SG9 0BL
14th May 2025
Demolition of outbuildings and the extension and conversion of garage to form an annexe. Relocation of oil tank.
Well Cottage Anstey Hertfordshire SG9 0BN
25th March 2025
Demolition of outbuilding. Partial demolition of single-storey 20th Century additions, refurbishment and alterations to retained single-storey elements and insert roof
Well Cottage Anstey Hertfordshire SG9 0BN
25th March 2025
Demolition of outbuilding. Partial demolition of single-storey 20th Century additions, refurbishment and alterations to retained single-storey elements and insert roof
Bentleys Cottage Mill Lane Anstey Hertfordshire SG9 0BL
4th March 2025
Demolition of outbuildings and the conversion and extension of garage to annexe with a car port, incorporating mezzanine level, insertion of rooflight, flue and externa
Dove Cottage Silver Street Anstey Hertfordshire SG9 0DH
22nd January 2025
Discharge of condition 5 (archaeological work) of planning approval 3/23/0558/HH
Fiddlers Lodge Anstey Hertfordshire SG9 0BW
31st December 2024
Installation of solar panels on the end of the pitched roof.
Puttocks End Farm Anstey Road Anstey Hertfordshire SG9 0DG
18th December 2024
Construction of a single storey link extension between the house and the existing outbuilding with a covered porch area. Conversion of the outbuilding for habitable use
High Trees Barkway Road Anstey Hertfordshire SG9 0BE
3rd December 2024
Erection of single storey detached garage consisting of 2 open car ports and an enclosed garden store and retrospective application for the erection of timber entrance
Puttocks End Farm Anstey Road Anstey Hertfordshire SG9 0DG
19th November 2024
Creation of a link between the house and the existing outbuilding.
5 Castle Cottages Anstey Hertfordshire SG9 0BW
3rd September 2024
9 solar panels on the flat roof on the attached sheds at back of the house.
High Trees Barkway Road Anstey Hertfordshire SG9 0BE
26th June 2024
Erection of single storey detached garage consisting of 2 open car ports and an enclosed garden store
Granary Cottage Anstey Hertfordshire SG9 0BY
25th June 2024
Creation of raised terrace to south elevation, with associated landscaping
Granary Cottage Anstey Hertfordshire SG9 0BY
25th June 2024
Creation of raised terrace to south elevation, with associated landscaping
Little Thatch Mill Lane Anstey Hertfordshire SG9 0BL
8th April 2024
To replace existing windows to front facade, east elevation first floor and rear, ground floor of principal dwelling with new cottage style window frames to match west facing elevation.
8 Moatside Anstey Hertfordshire SG9 0DD
5th February 2024
Removal of rear canopy roof and conversion of loft to habitable space with 2 rear dormer windows and 2 front rooflights.
Anstey Hall Anstey Hertfordshire SG9 0BY
21st December 2023
Discharge of condition 3 (Materials) 4 (Windows) 5 (Doors) of planning approval 3/23/1804/LBC
Anstey Hall Anstey Hertfordshire SG9 0BY
18th December 2023
Discharge of condition 3 (Materials of construction) of planning approval 3/23/1803/HH
Elm Cottage Barkway Road Anstey Buntingford Hertfordshire SG9 0BN
4th October 2023
Demolition of conservatory and erection of part single part two storey rear extension. Installation of five roof light windows, enlargement of rear patio and associated landscaping.